Home / Solutions / AI infrastructure
AI infrastructure and GPU cloud

GPU clusters that are busy, not waiting

GPUs are the most expensive part of an AI platform, and also the easiest to waste. They sit idle when the network is too slow, when storage cannot feed them data, or when the data centre cannot power and cool them. We design the whole stack around the GPUs: servers, fabric, storage, scheduling, power and cooling.

What usually goes wrong

Why GPU projects disappoint

The data centre is not ready

One 8-GPU server draws about 10 kW. Many enterprise racks are built for 5 to 10 kW in total. The servers arrive and there is nowhere to plug them in.

GPUs wait on the network

Training across servers exchanges data after every step. On ordinary data-centre networking, GPUs spend much of their time waiting.

Storage cannot keep up

Loading data and writing checkpoints on general-purpose storage leaves expensive GPUs idle for minutes at a time.

Nobody can see utilisation

Without GPU-aware scheduling and monitoring, shared clusters run well below capacity while teams queue for access.

Try it

How many GPUs do I need?

Pick a model size and what you want to do with it. The estimate shows GPU memory, number of GPUs and servers, and roughly how much power they draw.

The building blocks

Six layers of a GPU platform

LayerWhat it isWhat goes wrong if it is weak
GPU servers8-GPU servers (HGX H100, H200, B200, B300 and similar), or PCIe servers (H100 NVL, H200 NVL, L40S, L4) for lighter or inference-only workWrong GPU for the job: paying for training-class GPUs to serve small models, or the reverse
GPU fabricA dedicated network between GPUs, usually 400 Gb/s per GPU over InfiniBand or RoCE EthernetMulti-server training runs at a fraction of its potential speed
StorageA fast parallel file system for datasets and checkpoints, plus object storage for raw dataGPUs idle while data loads or checkpoints write
SchedulingSlurm for training, Kubernetes with the NVIDIA GPU Operator for serving, or bothQueues, idle GPUs and arguments about who gets access
MonitoringGPU health and utilisation (DCGM), job metrics and cost per teamFailing GPUs and wasted capacity go unnoticed
Power and coolingHigh-density racks, often 30 kW or more, with rear-door or liquid coolingThe cluster cannot be installed, or runs throttled because it overheats
Ways to get GPUs

Buy, host or rent

OptionGood forTrade-off
Buy and host in your own data centreSteady, long-term use; data that must stay on your premisesLarge upfront cost, lead times, and your data centre must handle the power
Buy and place in a colocation facilitySame as above when your own data centre cannot take the power densityColocation contract and remote hands; still a capital purchase
Rent from a GPU cloudShort projects, experiments, bursts of trainingHighest cost per GPU-hour over time; capacity can be limited at busy times

Many organisations start in a GPU cloud to learn their real usage, then buy for the steady part.

How we work

How a GPU engagement runs

  1. Workload first. Which models, training or inference, how many users, what latency. This decides everything else.
  2. Sizing. GPUs, servers, fabric, storage and software, with the assumptions written down.
  3. Data-centre readiness. Power per rack, cooling, floor loading and cabling, checked before anything is ordered.
  4. Bill of materials. Vendor-neutral, with alternatives where lead times or budget require them.
  5. Build and burn-in. Installation, fabric validation and stress tests before users get access.
  6. Handover. Scheduler, monitoring and runbooks in place, with your team trained to run them.

Planning a GPU cluster?

Tell us the models you want to run or train, how many users, and where it will be hosted. We will come back with a first sizing: GPUs, servers, network, storage, and the power and cooling your data centre will need.